The challenge
The Puratos Group wanted to expand considerably and increase the quality of production, without disrupting current production or food safety.
But how do you ensure that construction and production remain separate? That crane set-ups do not obstruct the expedition. That contractors can set to work without disrupting the production. This is a complex technical puzzle for which Uticon worked closely with numerous stakeholders, looking at routing, food safety, the optimal design of new production lines and devising a new line.The solution
Uticon recommended a three-phase expansion with an increase of 6,500 tonnes of production capacity per year. A well-considered routing brought people, building materials, raw materials, and end products to the right place on time and safely. The building process was separated from the production process by means of barriers, tents, and screens. Traffic lights were used during the production peak levels. On screens, employees were informed about the building process in order to create support and prevent unexpected disruption.